{"docs":[{"id":124,"title":"Component Selection: Lifecycle, Second Sources and Lead Times","heading":"Component Selection: Lifecycle, Second Sources and Lead Times","subheading":null,"category":"Hardware Design","body":{"root":{"type":"root","children":[{"type":"heading","tag":"h3","version":1,"children":[{"type":"text","text":"Reducing supply risk","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Check the lifecycle status of every part in manufacturer and distributor data before it goes into the schematic, and favour parts that are active and widely stocked. Passive parts in standard packages and values are usually available from several manufacturers; specialised ICs often are not.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"For single-source parts, decide in advance what happens if supply fails: a footprint that accepts an alternative, a qualified substitute, or buffer stock. Product change notifications and end-of-life notices should go to someone who will act on them.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"tags":"Hardware Design, Components, Supply Chain","cardCta":{"label":null,"link":null},"pageCta":{"label":"Talk to AAVICO engineering","link":"/contact"},"excerpt":"A part that is ideal on paper but obsolete, single-sourced or out of stock can stop production. Supply risk belongs in component selection from the start.","featuredImage":null,"type":"Blog","readTime":"3 min read","publishedAt":"2026-11-15T22:39:00.000Z","heroImage":null,"introText":"Choosing a component used to mean matching its electrical specification to the circuit. For any product that will be built for more than a few months, that is only half the decision. The part must also be available when production needs it, for as long as the product is sold, and ideally from more than one source. This article explains lifecycle status, second sourcing and lead times, and how to build them into selection.","metrics":[{"id":"component-selection-lifecycle-second-sources-and-metric-1","value":"Active","label":"The part is in production and recommended for new designs.","icon":null},{"id":"component-selection-lifecycle-second-sources-and-metric-2","value":"NRND","label":"Not recommended for new designs: still made, but its end is in sight.","icon":null},{"id":"component-selection-lifecycle-second-sources-and-metric-3","value":"EOL","label":"End of life announced, usually with a last-time-buy window.","icon":null},{"id":"component-selection-lifecycle-second-sources-and-metric-4","value":"LTB","label":"Last-time buy: the final chance to order before production stops.","icon":null}],"gallery":[],"challenge":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Parts are chosen during prototyping, when a handful of units from a distributor is easy to find. The supply question appears months later, when production needs thousands and the part turns out to be on allocation, nearing end of life or available from only one manufacturer.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Replacing a part late is rarely simple. Even a close equivalent may need a new footprint, firmware changes or repeated qualification and certification testing.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"blockquote":{"quote":"A component is only the right choice if you can still buy it when the product is a success.","author":"","role":"AAVICO Engineering"},"supportImage1":null,"deliverables":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Classify each BOM line by risk: multi-source standard parts, single-source parts with alternatives, and single-source parts with none.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"For the riskiest lines, check lifecycle status and stock across distributors, and identify or design in an alternative.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Review the BOM again before every production order, because lifecycle status and lead times change.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"results":[{"id":"component-selection-lifecycle-second-sources-and-result-1","title":"Continuity","description":"Production is not stopped by a single unavailable part."},{"id":"component-selection-lifecycle-second-sources-and-result-2","title":"Lower Redesign Cost","description":"Alternatives are planned in, not forced in later."},{"id":"component-selection-lifecycle-second-sources-and-result-3","title":"Longer Product Life","description":"Parts are chosen to outlast the planned sales period."},{"id":"component-selection-lifecycle-second-sources-and-result-4","title":"Negotiating Position","description":"Second sources give options on price and delivery."}],"lookingAhead":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Semiconductor lead times can change sharply with market conditions, from stock to many months. Check them at each order rather than relying on a past figure.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"For long-life products in industrial or medical markets, ask manufacturers about longevity programmes, which commit to supply for a stated period.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"supportImage2":null,"testimonial":{"quote":null,"author":null,"role":null,"photo":null},"challengesSolved":[{"id":"component-selection-lifecycle-second-sources-and-challenge-1","title":"Production stopped by one unavailable part","description":null,"icon":null},{"id":"component-selection-lifecycle-second-sources-and-challenge-2","title":"Designing in a part already marked NRND","description":null,"icon":null},{"id":"component-selection-lifecycle-second-sources-and-challenge-3","title":"Late redesign to replace an obsolete IC","description":null,"icon":null},{"id":"component-selection-lifecycle-second-sources-and-challenge-4","title":"End-of-life notices that nobody read","description":null,"icon":null}],"relatedPosts":[],"contactUs":{"show":true},"updatedAt":"2026-11-15T17:32:32.682Z","createdAt":"2026-11-15T17:32:32.682Z"}],"hasNextPage":false,"hasPrevPage":false,"limit":10,"nextPage":null,"page":1,"pagingCounter":1,"prevPage":null,"totalDocs":1,"totalPages":1}