{"docs":[{"id":133,"title":"EVT, DVT and PVT: The Prototype Builds Explained","heading":"EVT, DVT and PVT: The Prototype Builds Explained","subheading":null,"category":"Prototyping","body":{"root":{"type":"root","children":[{"type":"heading","tag":"h3","version":1,"children":[{"type":"text","text":"What changes from build to build","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"EVT units may use hand assembly, printed or machined enclosures and some rework; the aim is to prove the electronics and core function. DVT units should be built to the intended design, materials and processes, because they are the units that undergo full verification, environmental testing and certification.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"PVT units come off the real production line with production tooling, fixtures and test procedures. Their purpose is to measure yield and process stability and to train the factory, rather than to find design problems, which should be rare by this stage.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"tags":"Prototyping, Product Development, Manufacturing","cardCta":{"label":null,"link":null},"pageCta":{"label":"Talk to AAVICO engineering","link":"/contact"},"excerpt":"Engineering, design and production validation builds each answer a different question. Knowing which question a build is meant to answer keeps prototypes focused and schedules honest.","featuredImage":null,"type":"Blog","readTime":"3 min read","publishedAt":"2026-11-15T21:36:00.000Z","heroImage":null,"introText":"Hardware is not proven in one step. Most products pass through a series of prototype builds, each closer to the final product and each answering a different question. The terms EVT, DVT and PVT come from consumer electronics but are now used widely. Treating every build as simply another prototype wastes their value. This article explains what each build is for, how it should be made, and what must be true to move on.","metrics":[{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-metric-1","value":"EVT","label":"Engineering validation test: does the design work and deliver its core functions?","icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-metric-2","value":"DVT","label":"Design validation test: does the final design meet every requirement, including certification?","icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-metric-3","value":"PVT","label":"Production validation test: can the factory build it repeatably at rate?","icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-metric-4","value":"MP","label":"Mass production, which starts once PVT units meet their exit criteria.","icon":null}],"gallery":[],"challenge":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Without defined builds, prototypes drift. Changes are made between every batch, no build is fully tested, and the design is never stable long enough to prove anything. Certification testing on an unstable design often has to be repeated.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"The opposite risk is moving to production tooling too early. Injection mould tools and test fixtures are expensive to change, so committing to them before the design is validated turns every late fix into a large cost.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"blockquote":{"quote":"Name the question each build must answer before you order it, and do not call it finished until the answer is in.","author":"","role":"AAVICO Engineering"},"supportImage1":null,"deliverables":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Define each build with its purpose, quantity, build method and exit criteria before ordering parts.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Freeze the design between builds, record every change with its reason and roll changes into the next build rather than mid-batch.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Hold an exit review after each build and start the next only when the criteria are met or the open issues are formally accepted.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"results":[{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-result-1","title":"Focused Testing","description":"Each build is tested against the question it was built to answer."},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-result-2","title":"Stable Certification","description":"Compliance testing is done on the design that will ship."},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-result-3","title":"Tooling Confidence","description":"Expensive tools are committed after the design is proven."},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-result-4","title":"Production Yield","description":"Process problems are found at PVT, not in the first customer shipments."}],"lookingAhead":{"root":{"type":"root","children":[{"type":"paragraph","version":1,"children":[{"type":"text","text":"Small products and low-volume equipment may combine stages, for example a single DVT and PVT build. The questions still need answers, even if fewer builds answer them.","version":1}]},{"type":"paragraph","version":1,"children":[{"type":"text","text":"Plan quantities for destructive tests, certification samples and spares. Underbuilding DVT units forces another build when samples run out.","version":1}]}],"direction":"ltr","format":"","indent":0,"version":1}},"supportImage2":null,"testimonial":{"quote":null,"author":null,"role":null,"photo":null},"challengesSolved":[{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-challenge-1","title":"Prototypes changed in every batch","description":null,"icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-challenge-2","title":"Certification repeated on a revised design","description":null,"icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-challenge-3","title":"Tooling changes after the design moved","description":null,"icon":null},{"id":"evt-dvt-and-pvt-the-prototype-builds-explained-challenge-4","title":"Running out of units for destructive tests","description":null,"icon":null}],"relatedPosts":[],"contactUs":{"show":true},"updatedAt":"2026-11-15T17:32:32.682Z","createdAt":"2026-11-15T17:32:32.682Z"}],"hasNextPage":false,"hasPrevPage":false,"limit":10,"nextPage":null,"page":1,"pagingCounter":1,"prevPage":null,"totalDocs":1,"totalPages":1}