Board Bring-up Checklist

A step-by-step checklist for powering a new board safely for the first time, with a results log

The first power-up of a new board is when an orientation mistake, a solder bridge or a footprint error is cheapest to find and easiest to make worse. A methodical bring-up finds faults one at a time with the energy limited, so a fault costs a part rather than a board.

Print one copy per board. Work through the stages in order, stop at the first unexpected result, and record every measurement in the results table so later boards can be compared with the first. The checklist is generic; add the rails, clocks and interfaces of your own design before you start.

What is inside

  • Preparation and equipment checklist
  • Visual and orientation inspection before power
  • Unpowered resistance checks on every rail
  • First power procedure on a current-limited supply
  • Rail, ripple and sequencing checks
  • Clock, reset, programming and debug checks
  • Peripheral and interface checks
  • Board record fields and a results table template

Contents

  1. Before you start
  2. Stage 1: inspection before power
  3. Stage 2: unpowered resistance checks
  4. Stage 3: first power on a current-limited supply
  5. Stage 4: rails and sequencing
  6. Stage 5: clocks, resets and boot
  7. Stage 6: programming and debug
  8. Stage 7: peripherals and interfaces
  9. Recording results
  10. Notes and limits

Formats: PDF document. Sign in to download for free.

Related courses

Discuss your project

Email support@aavico.com or use Get in Touch when the website finishes loading.