Schematic Design Review Checklist
Concrete checks for power, pins, protection, connectors and BOM data before layout starts
A schematic error found before layout costs minutes; the same error found at bring-up costs a respin. This checklist turns a schematic review into a repeatable process: each item is a statement the reviewer can confirm against the schematic, the datasheets and the BOM.
Use it for a self-review before you ask for a peer review, then again in the formal review meeting. Record findings and their resolution in the sign-off table at the end so the review leaves a trail.
What is inside
- Power tree, regulator and power budget checks
- Decoupling and bulk capacitance checks, including MLCC DC bias derating
- A pin-by-pin accounting check for unused, no-connect and exposed pads
- Pull-up, pull-down and boot strap checks with the I2C pull-up sizing formulae
- Protection and connector checks
- Net naming, BOM attribute and documentation checks
- A review sign-off table and findings log
Contents
- Before the review
- Power
- Decoupling
- Every pin accounted for
- Pull-ups, pull-downs and straps
- Protection
- Connectors
- Net naming, BOM and documentation
- Review sign-off
- Notes and limits
Formats: PDF document. Sign in to download for free.
Related courses
Discuss your project
Email support@aavico.com or use Get in Touch when the website finishes loading.